Friday, September 26, 2008

Good afternoon's work.


Mark got us started and then left us to it.


We had loads of time to fiddle.


To start with the curve left a lot to be desired.


We twiddled with the air box, then jets and needles.

Four hours later, not a lot more power but a much more acceptable curve.

Thanks of course to everyone at Slipstream.

No comments: